La relazione tecnica del piano urbano traffico

CONTENTS

  • 1. PROJECT
  • 2. quality interventions' URBAN
  • 2.1 The cycling and pedestrian corridors protected
  • 2.2 The new pedestrian area of \u200b\u200bVia Garibaldi
  • 2.3 The Traffic Plan and the 1996 Presidential Decree n.503
  • 3. INTERVENTIONS traffic calming
  • 4. INTERVENTION IN STAGING
  • 5. INTERVENTION IN MOVEMENT
  • 5.1 Systems and fluidization of the axis of Via Nazionale
  • 5.2 The system object nodes
  • 5.2.1 Intersection of Piazza Marco Polo
  • 5.2.2 Location of the node between the Marina Trieste and viability 'out of the new railway underpass
  • 5.2.3 Intersection Via Nazionale - via Salara
  • 5.2.4 Intersection Piazza Ungheria
  • 5.2.5 Intersection Via Nazionale - Via Adriatica
  • 5.2.6 Intersection Via Nazionale - Via Emilia
  • 5.2.7 Intersection Via Nazionale - via Palermo
  • 5.2.8 Hypothesis of accommodation for the subdivision road north of Cologne and Roseto (Borsacchio)
  • 5.2.9 Solutions to the traffic junction of Via Galliani graft in the SS 150
  • 5.2.10 Accommodation traffic area ex Autogas and engagement on the SP 150 SS 16
  • 5.2.11 Solution for the junction between Viale Europa, Via Tronto
  • via Oglio
  • 5.3 Access of heavy vehicles in the waterfront
  • 5.4 Arranging the promenades
  • 5.5 Conflict Resolution circulatory
  • 5.5.1 Area Mezzopreti way - via Manzoni
  • 5.5.2 Area of \u200b\u200bthe compact city to the west of Via Nazionale
  • 5.6 Systems hectometres
  • 6. PROJECTS new road infrastructure in the town of Roseto 48
  • Report
  • Plant
Index